Vertest was engaged by QAL to Ultrasonically inspect Digester 1 and 5 Slurry Inlet lines for possible Stress Corrosion Cracking (SCC).

Vertest were engaged by The Boonal Joint Venture (BJV) in association with GHD to complete an integrity inspection on their train load out bin which loads coal from both Yarrabee and Jelinbah coal mines south of Blackwater in Central Queensland.

One of Vertest’s NDT teams  was mobilised to Kwinana Power Station in WA, working for Synergy, to provide NDT testing on the natural gas infrastructure.




At Pacific National’s Dysart yard, Vertest were called upon to work alongside Pacific National in testing and creating a condition monitoring strategy to prevent failures leading to improved productivity by minimising down time and unexpected stoppages.

Vertest provide full non destructive testing services for refineries, with testing of all services completed on ropes, improving on time and cost.